Technical requirements: As it is a casting, the fixture can only be roughly positioned. Use a probe to find the center and correct the XYZ coordinates.
Technical difficulty: 10000 operations per day. It is used very frequently, which greatly tests the return of the probe and the stability of the signal. At the same time, there is a high demand for power saving, with a requirement of over one million cycles for ordinary two 14250 lithium batteries.